Skip to content

JOBUZO

  • News
  • Indonesia
  • Toggle search form
NASA delays astronaut moon mission over glitch

NASA delays astronaut moon mission over glitch

Posted on 23 February 2026 By jobuzo

CAPE CANAVERAL, Florida — In the latest setback to return astronauts to the moon, NASA delayed the highly anticipated flight yet again after a new problem cropped up with the rocket on Saturday.

April is now the earliest that the four Artemis II astronauts could fly to the moon.

NASA revealed the latest problem just one day after targeting March 6 for Artemis II, humanity’s first flight to the moon in more than half a century. Overnight, the flow of helium to the rocket’s upper stage was interrupted, officials said. Solid helium flow is essential for purging the engines and pressurizing the fuel tanks.

This helium issue has nothing to do with the hydrogen fuel leaks that marred a countdown dress rehearsal of the Space Launch System rocket earlier this month and forced a repeat test.

NASA Administrator Jared Isaacman said a bad filter, valve or connection plate could be to blame for the stalled helium flow. Regardless of the cause, he said, the only way to access the area and fix the problem is to return the 98-meter rocket to its hangar for repairs.

“We will begin preparations for rollback, and this will take the March launch window out of consideration,” Isaacman said via X. NASA’s next opportunities would be at the beginning or end of April.

News :<div>12 weeks' jail for school IT support technician who took upskirt videos of teachers</div>

“I understand people are disappointed by this development,” he added. “That disappointment is felt most by the team at NASA, who have been working tirelessly to prepare for this great endeavor.”

Earlier in the day, NASA said it was preparing to move the rocket back to the Vehicle Assembly Building at Kennedy Space Center while raising the possibility of the work being done at the pad.

Hydrogen fuel leaks had already delayed the Artemis II lunar fly-around by a month. A second fueling test on Thursday revealed hardly any leaks, giving managers confidence to aim for a March liftoff.

Everything worked fine with the rocket’s helium system during both dress rehearsals, Isaacman said. The “unexpected development” cropped up later in routine testing that kept engineers up all night assessing the situation.

NASA delays astronaut moon mission over glitch


News

Post navigation

Previous Post: Ant’s AQ health app tops 100 million users amid holiday surge
Next Post: Ex-Apple team launches Acme Weather, a new take on weather forecasting

Related Posts

Washington shows optimism on second day of US-China trade talks Washington shows optimism on second day of US-China trade talks News
Did Putin offer to stop sharing intelligence with Iran if US cut off supplies to Ukraine? Did Putin offer to stop sharing intelligence with Iran if US cut off supplies to Ukraine? News
Apple is already thinking about its second foldable iPhone, and it may be a clamshell Apple is already thinking about its second foldable iPhone, and it may be a clamshell News

Latest

  • 12 dead, more than 200 injured after M7.8 quake rocks southern Philippines
  • Israel’s Netanyahu acknowledges halt in fighting with Iran but vows to respond ‘with force’ to future attacks
  • The Latest: Israel and Iran trade fire in most serious confrontation since April truce
  • How to Get iOS 27 Beta 1 Right Now (Without a Computer)
  • Who Is Stunning Salsa And Bachata Dancer Rosa Marasciulo
  • ‘It’s all showbusiness’: Meet the publicist behind America’s political influencers
  • 6 family members dead after first ride in new Proton X50 ends in collision with lorry in M’sia
  • Israel hits Iran petrochemical plant in new strikes after Trump reprimand
  • Tonys 2026: Complete Winners List 
  • Uber, Wayve and Waymo are headed towards a robotaxi showdown in London

Copyright © 2025 JOBUZO. Disclaimers | Privacy Policies

Powered by PressBook Masonry Blogs